Free checklist
Division 33 Utilities pre-submittal checklist
Run this before you send a Division 33 package. It walks the same checks a GC reviewer or architect runs, so you find the problems first. Tick items on screen or print it.
Short answer
Before you send a Division 33 Utilities submittal, confirm six things: the named products match the spec, performance values meet the spec numbers, required certifications are attached, finishes match the selection, details match the drawings, and every required item is in the package. This checklist breaks those into 65 specific checks. Free, printable, no email required.
Division 33 Utilities pre-submittal checklist
1. Before you start
These apply to every submittal, whatever the trade.
2. Named manufacturers and products match the spec Blocker
Compare every product in the package to the manufacturer and model the spec names. If anything differs, attach the approved substitution or or-equal letter, or swap back before you send. Tick each item once you have checked it and nothing below applies without written approval.
Why manufacturer or product substitution matters in Division 33 →
3. Performance values meet the spec numbers Blocker
Put the data sheet next to the spec and compare the actual values, not just the test method. A sheet that says "tested per ASTM" without the number is not proof. Tick each value once it meets or beats the spec.
4. Certifications and test reports are attached Fix and Resubmit
Reviewers want the report itself, not a line on the data sheet saying one exists. Tick each document that the spec requires and the package actually contains. Skip lines that do not apply to your section.
Why missing certification or compliance documentation matters in Division 33 →
5. Colors, finishes, and profiles match the selection Fix and Resubmit
Match each visible attribute to the spec text and the architect's approved sample or color schedule. Tick each one you have confirmed.
6. Details and installation match the spec and drawings Fix and Resubmit
These are the mismatches reviewers catch most in this division. Check your shop drawings and installation data against the spec and the contract drawings, and tick each line once you have confirmed it does not apply to your package.
Why detail or installation mismatch matters in Division 33 →
7. Every required item is in the package Fix and Resubmit
Open the submittal articles in Part 1 of your spec section (often split into action and informational submittals) and confirm each required item is present. The list below is what this division's specs most often require.
Why submittal package incompleteness matters in Division 33 →
How to use this checklist
Work through it with the spec section open next to the package. Your ticks and the fields at the top save in this browser, so you can come back to it. Print it or save it as a PDF to attach to your own records, or grab the blank PDF to fill in by hand. The items come from the same Division 33 deviation taxonomy Deviation Check uses to review submittals, so they line up with what a reviewer will look for.
Frequently asked questions
What should a Division 33 Utilities submittal include?
Most Division 33 specs ask for pipe manufacturer data sheet with pressure class, wall thickness, and applicable AWWA/ASTM standard; joint gasket certification (ASTM F477 for PVC, AWWA C111 for ductile iron); fitting data sheets with pressure rating and end connection details; precast manhole shop drawing showing wall thickness, reinforcing, step locations, and joint detail; and fire hydrant performance data sheet with flow rate, hose and pumper connection sizes, and operating nut size. The submittal articles in Part 1 of your spec section set the final list, so check it against this one.
What gets a Division 33 submittal sent back?
The findings that stop a Division 33 package cold include missing NSF/ANSI 61 certification for potable water pipe, fittings, or coatings; missing NSF/ANSI 372 lead-free compliance for water fittings; and pipe pressure class below system working pressure plus surge allowance. Each is graded a Blocker, which means the package cannot be approved until it is fixed.
Is this checklist free?
Yes. The page and the PDF are free with no email or account. If you want the package itself checked against your spec, a Deviation Check review is $35 per submittal.
View this page as Markdown for LLMs and note-taking.