Deviation Report: Acoustical Wall Treatment 09 84 13

Project: Project F

Subcontractor: Acoustic Solutions West, Inc.

Date: 2026-05-06

AI: Deviation Check v1, model claude-opus-4-7, confidence HIGH

APPROVED

Submittal supplies the basis-of-design product as specified, meets or exceeds all performance thresholds, and includes every required submittal item.

Submittal:

0 Blocker
0 Fix-and-Resubmit
0 Note-Only

No deviations found. Submittal aligns with spec.

PM signature: ________________________________ Date: ____________

Detailed findings

No deviations found. Submittal aligns with spec.

Redlines

None.

Reviewer notes

All six required submittal items are present (product data, ASTM C423 and E84 test reports, two 12x12 inch samples per color, GREENGUARD Gold and Buy America certifications, maintenance instructions, 10-year warranty). Performance values meet or exceed every spec threshold and the basis-of-design product, color, size, thickness, edge profile, and mounting all match. PM should still visually verify the physical Charcoal CW-CHR samples against the architect's approved color reference and confirm the attachments are physically present in the package before final stamp.

Generated 2026-05-06T15:12:26